Case Studies

Here is a selection of anonymised case studies that highlight how we have helped many businesses of all sizes with their supply chain and logistics challenges and projects in a variety of sectors.

SECTOR: DIY PRODUCTS

Project

  • Imports Supply Chain Review

  • £300m sales; 25,000 TEUs

  • Prepare a review of systems, processes and costs along the supply chain and identify priority areas for action

Tasks

  • Develop inventory analysis model to determine target stock requirements at each node along the supply chain

  • Build a cost-to-serve model for the Import Supply Chain and calculate the cost impact on the Far East and the UK of different supply chain options

  • Establish a framework for future development priorities and an implementation plan

Results

  • Identified £4m operating cost savings, £20m working capital  reduction

  • Provided a practical implementation plan

SECTOR: RETAILING – CONVENIENCE STORES

Project

  • Buying Price Analysis

  • £750m sales; 800 stores

  • Develop model of buying prices by key product sector (net buying prices; marketing spend; promotions; palletisation  discounts; retro’s etc.) for 3,200 Grocery lines

Tasks

  • Analyse cost differences between wholesale delivered prices and direct from supplier to central warehouse for compatible products

  • Establish savings estimates by product category

  • Audit results on implementation

Results

  • Savings of £3.6m delivered

SECTOR: RETAILING – FOOD ALL TEMPERATURES

Project

  • Future Network Strategy

  • £400m sales; 10,000 SKUs

  • Analyse current operations, determine strengths, weaknesses and current capacity constraints.

Tasks

  • Model logistics implications of store growth plans

  • Develop future design options for location of DCs and transport links 

  • Recommend the optimum solutions for different growth scenarios
  • Design new generation chill and ambient warehouses to maximise productivity in high service level environment 

Results

  • Identified the optimum locations and size of DC for the future network.  

  • New business plan and costings adopted for logistics operations. 

  • New warehouse design will yield a 25% improvement in productivity in a mature logistics operation.

SECTOR: RETAILING – CLOTHING

Project

  • Design a future warehousing strategy

  • £350m sales; 70,000 SKUs

  • Analyse current operations and determine strengths and weaknesses.

Tasks

  • Re-design layouts to improve capacity and performance

  • Develop future design options for long term warehousing  requirements taking account of development plans and centres of business gravity

  • Create new warehouse operational designs to maximize productivity 

Results

  • Identified opportunities to improve productivity by 32% and capacity of existing facilities by 18%

  • New operations reduced manpower requirements by 16% 

  • Strategy implemented

SECTOR: MANUFACTURING – CONSUMER GOODS

Project

  • Warehouse design and capacity planning

  • £500m sales; 27,000 pallet spaces

  • Analyse current DC operational performance and methods

Tasks

  • Develop capacity planning model for warehousing versus company growth plans

  • Design new factory warehouse (Narrow-aisle) considering environmental and site constraints

  • Cost new options and provide a detailed implementation plan and on-going project management advice 

Results

  • New DC built on time on budget

SECTOR: MANUFACTURING – CARPET ACCESSORIES

Project

  • Logistics strategy

  • £120m sales; 4 plants; 25,000 delivery locations 

  • Establish target stock levels for production and finished goods inventory

Tasks

  • Capacity analysis of warehousing and new operational design for a central warehouse operation

  • Develop new cross-dock model for distribution and reorganise transport planning and operations

  • Develop implementation plan 

Results

  • £3m cost savings

  • £2m inventory reduction

SECTOR: MANUFACTURING – BEVERAGES

Project

  • To review the cost/efficiency of current operations

  • £12m logistics spend 

  • Create a cost to serve model to quantify existing operations

Tasks

  • Prepare an Invitation to Tender covering  inbound shipping, warehousing and onward distribution

  • Negotiate with suppliers to change and standardise buying terms

  • Lead the selection process of shipping & logistics suppliers
  • Assist in implementation and established performance  measurement

Results

  • Significant cost savings, full visibility and transparency of product and information flows.

SECTOR: MANUFACTURING – BUILDING CONSTRUCTION

Project

  • To review the operating efficiency of the outsourced UK transport operations, identify areas for improvement and assist in implementation

  • One of the UK’s largest manufacturers of concrete slab and cube with 4 plants.

  • Establish target stock levels for production and finished goods inventory

Tasks

  • Mapped out all the processes, reviewed operating procedures and communication protocols, analysed the key performance indicators. 

  • Develop implementation plan 
  • Key staff were evaluated as were their locations and reporting structures

Results

  • Assist in implementation including establishing performance  measurement & a new pricing structure

  • Delivery failures dropped by 50%. 

  • Delivery costs reduced while financial returns to the transport operator improved.

SECTOR: MANUFACTURING – CHILLED FOOD

Project

  • To review the existing supply chain and make recommendations to reduce costs and improve customer service.

  • One of Europe’s largest suppliers of salad leaf to multiple retailers with a turnover in-excess of £12m

Tasks

  • Traced the product flows to end customer to identify any areas for concern and opportunities for improvement. Interviewed customers and third-party transport companies.

  • Benchmarking on transport costs. 

  • Assessed the product lifecycle from field to fork, with particular emphasis on product condition and waste.
  • Investigated all possible packaging options.
  • Assist in ITT preparation.

Results

  • Moved the transport operation on to a more formal footing and established long term relationships with key suppliers resulting in improved service and cost savings.

SECTOR: THIRD PARTY CONTRACTING – PALLET DISTRIBUTION

Project

  • Transport strategy
  • £140m sales; 1,000 vehicles; 90 locations

  • Optimise location of hubs and determine volume break- point for the development of new regional hubs

Tasks

  • Analyse regional delivery boundaries and improve efficiency of transport operation through realignment of boundaries and transport consolidation

  • Develop profitability model to determine business performance by customer and geographical area

  • Develop internal charging tariff based on weighted cost variables in transport and warehousing

Results

  • 2% margin improvement

  • Opportunities for a further 8% improvement at individual operating level

SECTOR: WHOLESALE – SPARE PARTS

Project

  • Develop a Pan-European Logistics Strategy

  • Develop cost-to-serve model for comparative efficiency analysis between countries

  • £420m sales; 200 locations; 9 countries; 150,000 SKUs

Tasks

  • Analyse economics of customer service proposition, stockholding locations and transport efficiencies

  • Develop profitability model to determine business performance by customer and geographical area

  • Compare centralised stock versus decentralised stock model and stocked versus bought-in.

Results

  • Reduction in operating locations by 43%

  • £5m inventory savings

  • £2m logistics cost savings

SECTOR: WHOLESALE DISTRIBUTION – BUILDING PRODUCTS

Project

  • Primary Transport Review

  • £200m sales; 12,000 pallets 

Tasks

  • Analyse current operation and establish benchmarks

  • Analyse options for an alternative operation to improve service levels and security of deliveries

  • Develop tender specification; Identify suitable contractors; Evaluate 3PL responses
  • Develop recommendations

Results

  • On-time delivery services with minimal product losses

  • 16% transport savings

SECTOR: MAIL ORDER AND INTERNET  – FASHION ACCESSORIES

Project

  • Automated Warehousing and Project Management

  • £900m sales; 120,000 SKUs

Tasks

  • Develop operating and capital budgets

  • Liaise with contractors & monitor performance

  • Project manage the implementation of high bay warehousing operation with a multi-level automated crane system
  • Develop interfaces between automated equipment and manual operations and troubleshoot issues as they arise

Results

  • Project delivered on time and on budget

SECTOR: RETAIL – SPARE PARTS

Project

  • Review current automated warehouse and identify strengths and weaknesses

  • Undertake audit of key operational and systems processes.

Tasks

  • Assess whether the original design is fit for purpose and what strategic factors need to be considered in the future.

  • Develop a strategic and tactical development plan to meet current operational weaknesses.

Results

  • Confirmed general effectiveness of existing design

  • Identified central weaknesses impacting on current operational performance

  • Developed a plan for improvement which was implemented.

SECTOR: RETAIL – GROCERY

Project

  • Design a 10-year Logistics Strategy for a 

  • £3.6bn business with 300 stores 

  • Review current operations (capacity/productivity)

Tasks

  • Analyse future store growth plans and implications for logistics and model future inventory levels

  • Analyse transport planning and operations to determine best fit for depot locations 

  • Develop a strategic and tactical development plan to meet  future logistics development needs of the business.

Results

  • Created a new logistics strategy which saved capital and minimised operating costs whilst providing the capacity and flexibility to deal with future growth plans

SECTOR: MANUFACTURING – BUILDING PRODUCTS

Project

  • Production Planning Strategy and Warehouse Design

  • For a £75m sales business

  • Create Production Strategy for a move from ‘Make to Order’ to ‘Make to Stock’

Tasks

  • Sales analysis to produce Inventory guidelines and methodology for safety stocks

  • Design a warehouse to hold the needed stock levels

  • Train staff in methodologies 
  • Customer Market Research Survey on changes to product delivery: palletisation and order from stock 

Results

  • Board invested in the necessary marketing, systems and warehousing to meet the new sales and production planning regime 

SECTOR: WHOLESALING – INDUSTRIAL PRODUCTS

Project

  • Inventory Review for a company with £100m sales and 10000 SKUs

  • Prepare a review of systems, forecasting and inventory planning processes and costs.

Tasks

  • Develop forecasting tools and an inventory analysis model to determine target stock requirements at each node along the supply chain. 

  • Test forecasting and inventory model

  • Establish a framework for forecasting and inventory decisions making and an implementation plan and recommendations

Results

  • Simple monthly methodology identified 15% saving in working capital and provided a practical implementation plan.

SECTOR: HEALTHCARE – MEDICAL DEVICES

Project

  • A global supplier of medical devices who acquired a large part of a European competitor business.

  • The project involved setting up a European 3PL hub in the Netherlands, inbounds from the USA, UK and EU.

  • The timeframes were short for start-up and involved sensitive transfer of business from competitor. 

Tasks

  • Identify, shortlist and pre audit 3PL suppliers

  • Prepare and run RFQ process together with final appointment of successful 3PL

  • Project manage 3PL start-up
  • Project manage inbound flows from USA, UK and EU
  • Post implementation support

Results

  • Identified creditable 3PL options.

  • Successful 3PL start-up

  • Cross functional support for revised inbound product flows

  • Workshop – Revised process flows

SECTOR: HEALTHCARE – DENTISTRY PRODUCTS

Project

  • Inventory Review

  • £80m sales; 7,500 SKUs

  • Prepare a review of systems, forecasting and inventory planning processes and costs.

Tasks

  • Develop forecasting tools ands inventory analysis model to determine target stock requirements.

  • Test forecasting and inventory model particularly for slow moving lumpy sales SKUs

  • Establish a framework for forecasting and inventory decision making and an implementation plan and recommendations

Results

  • Simple monthly methodology identified 15% saving in working capital and provided a practical implementation plan

Our Clients

From corporate offices to large-scale events, our clients trust us to deliver reliable and professional security solutions tailored to their needs. Drawing on decades of experience, we benchmark our approach against leading supply chain consulting companies to ensure clients receive measurable, world-class outcomes